A. Project Opportunity Description
|
À1. Project Name
|
|
(à) Short name: Technical Re-equipment of
Giant Tire Plant
(b) Full name: Giant
Tire Plant. Main Building. Technical Re-equipment of the Plant.
(c) Summary: The
Project is aimed at increasing the volume of output and expanding the
assortment of large-size and giant cross-ply and radial tires that are
compliant with the current engineering excellence of the leading foreign
manufacturers and meet the demands of both the industry of the Republic of Belarus and customers in CIS countries and other countries worldwide.
|
|
A2. Project Status
|
Pre-investment
stage. A business plan has been worked out, design and estimate documentation
has been examined. Process is being adjusted; tender documentation to
purchase equipment is being elaborated.
|
|
A3. Organizations involved and their
roles
|
(à) Belshina
JSC — borrower, Republic of Belarus, Mogilev region, Bobruisk
Mr.
Dmitriy Katerinich , Director General
Tel.
+375 (225) 43 43 90, Fax +375 (225) 43 31 11, 44 63 88
|
|
À4.
Project Description (approaches, objectives, components, results, stages,
time, financing, advantages, influence on transient processes in economics,
etc.)
|
|
The
program of technical re-equipment of the Giant tire plant includes upgrading
and modification of the existing equipment, replacement of morally and
physically obsolete equipment to increase the volume of output, expand the
assortment produced, raise productivity of labor, upgrade the quality of
production, and improve labor conditions.
Achievement of this investment project allows to raise labour productivity,
to lower fuel-energy resource consuming, save and improve competitive
position in the home and foreign markets, to increase export potential.
|
|
À5.
Background / history / overall program / related or similar projects
|
|
Key activities of Belshina JSC: production of tires for
heavy-duty dump trucks and super heavy-duty dump trucks, for
construction, road-building and materials-handling vehicles, tractors
and agricultural vehicles, motor cars and light trucks, trucks and
buses and re-treaded tires.
Belshina JSC includes:
Giant Tire Plant is a manufacturer of
tires for dump trucks of high load-carrying capacity, construction and road
vehicles, trailers, and agricultural machinery.
OTR tire plant is a manufacturer of
tires for heavy-duty dump trucks that are operated in open cast mines of
metal mining industry. Belshina JSC is the sole producer of OTR tires
among the tire plants in CIS coun-tries.
Car and truck tire
plant produces tires for truck families such as MAZ, GAZ, ZIL, buses, and
agricultural machinery. It also produces tires for motor cars such as VAZ,
Moskvich, Volga, and practically all types of imported cars.
Mechanical plant produces polymer and
optional equipment and spares, performs major repairs of equip-ment at the
tire plants
The company output is
marketed in the Republic of Belarus and exported to more than 50 countries
world-wide. Exports account for more than 60% of total sales. The share
of certified products is 90%. The plant has been certified for compliance
with the international quality system standard ISO 9001 — 2000.
|
|
À6. Environmental impact summary
|
|
Significant
emissions are within the permissible limits. Modern equipment and
technologies will permit to reduce total emissions, reduction of fuel and
power consumption including.
|
|
À7.
Possible obstacles/ problems/ risk assessment
|
|
The most
important risk to which Project implementation is exposed is the growth of prices
for raw materials and supplies.
|
|
À8.
Project implementation and recoupment period
|
|
Project implementation
period: 5 year, payback period: 6.17 years..
|
|
À9.
The branch of industry the Project belongs to
|
|
Petrochemical branch
|
|
B. Capital Cost Items (total investment
required for the Project realization)
|
|
Â1.
Project physical components (equipment, works, services, etc. required for
the Project implementation)
|
Â2.
Capital cost, '000 EURO
|
|
Purchase
of equipment, including spare parts and installation supervision
|
32520
|
|
Other
costs
|
6769
|
|
Total
|
39285
|
|
Ñ.
Capital (as per its source of origin) to be available from the project
initiator, owners, copartners, sponsors)
|
|
Ñ1. Type of sources
|
C2. Amount, '000 EURO
|
|
Internal
funds of Belshina JSC
|
6769
|
|
D. Investments required. Insufficient
means
|
|
D1. Lack of required
funds, type of financial assistance (credit, share interest and e.t.c)
|
|
Lack of required funds
is 32520 '000 EURO . Type of financial assistance— crediting, direct
investments
|
|
D2.
Sources of financing
|
D3.Type of financial instrument
|
D4. Amount, '000 EURO
|
|
Investor's funds
|
Credit,
loan, direct investment
|
32520
|
|
Å.
Demand (Consumers) and revenues
|
|
Å1.
Type of consumers/markets, volumes, prices, revenues, profits/savings:
|
|
Consumers of products
to be produced: domestic market (BelAZ), CIS markets (open-mine vehicles)
world markets (India, Indonesia, Western Europe). Expected assortment of
products: 33.00-51, 27.00-49, 24.00-35, 21.00-35, 37.5-39, 35/65-33, 29,5R25,
26,5R25, 23,5R25 with volume of production 26.3 thousand units/year.
|
|
Å2.
Revenues (Sales)
|
Å3. Amount, '000 EURO
|
|
Revenue
from sales of tires
|
49081
|
|
F. Operating and Maintenance Expenses
|
|
F1. Expenses components, expenses cover
strategy, organization of production
To implement the
project, the enterprise has unused production space, utilities and liner
networks, power sources, and part of equipment required therefore. No need of
new buildings and structures.
|
|
F2.
Cost items
|
F3. Amount, '000 EURO
|
|
TOTAL
costs of marketing
|
42713
|
|
G. Income
|
|
G1. Receipts E2 less operating
expenses F2
|
G2. Amount, '000 EURO
|
|
|
6368
|
|
H. Source of Information about the
Project
|
|
Í1.
This form is filled in by (Name, position):
Dubasov Dmitri
Yurjevich , Head of Advanced Development and Investment Department
|
|
H2. Organization (name and address):
Belshina JSC, Republic of Belarus, Mogilev region, Bobruisk, Minsk Highway
|
|
H3. Òål/Fax/ Å-mail:
8 (0225) 43 43 90; 43 31 11, 44
63 88; belshina@belshina.biz
|
|
H4. Date: 04.09.2008
|
|
H5. Departmental identity of the Project: concern
"Belneftekhim"
|
Read also:
|
|
 |
|
 |